Site Prep 101: What to Handle Before the Crew Shows Up

The build starts long before the first post goes in. Good site prep is invisible on the finished building and painfully obvious when it’s skipped. Here’s what to think through early, and what the quote conversation will sort out for you.

Pick the spot like it’s permanent

Because it is. Before anything else, think about where the building sits. Setback requirements from property lines and other buildings vary by municipality, so check yours early. Think about snow: prevailing wind decides where drifts pile up, and a door facing the wrong way means shovelling all winter. Think about water: high ground beats low ground, always. Leave room to expand, because additions happen more often than people plan for. And think about the approach angle, since you’ll be swinging trucks and trailers into this building for the next thirty years.

Moving a building on paper is free. Moving it after the pad is built is not.

Ground and grading

The pad needs to be built up, compacted, and graded so water runs away from the building, not toward it. Water is patient. A pad that holds water against posts and slab will spend decades proving it.

Weather matters here too. Wet years and spring breakup fight the dirt work, which is one of the reasons timelines tie to the calendar. We covered that in How Long Does It Take to Build a Shop on the Prairies.

Who does the dirt work varies from project to project. Sometimes it’s yours, sometimes it’s arranged through the build. The quote spells out whose scope it is so nothing falls between the cracks.

Utilities and locates

Before anyone digs anything, get your locates done through the provincial service: Utility Safety Partners in Alberta, Sask 1st Call in Saskatchewan. It’s free, it’s required, and it keeps everybody safe.

Then plan the services the building will need. Power sized for what you’ll actually run, because a welder and a compressor ask more of a panel than lights do. Gas if the building will be heated. Water if there’s a wash bay in the plan. Trenching is cheap while the equipment is already on site and expensive the year after, so decide early even if you rough in for later.

Access for the build itself

Concrete trucks, material deliveries, and lift equipment all need to reach the site. An approach that’s too narrow or too soft adds time and cost to the build, and it keeps doing it every time something big visits the yard afterward. Plan the approach for the largest truck that will ever come down it, not the pickup.

Permits and paperwork

Development and building permits run through your municipality, and rural counties handle things differently than cities. Who applies depends on the project, and it’s one of the first things the quote conversation settles. The main thing is starting early, because permit time is the part nobody can compress.

One small thing that speeds everything up: know your legal land description. It helps with locates, permits, and making sure the delivery driver finds the right quarter.


You don’t need all of this figured out before asking for a quote. The conversation covers it. But thinking it through early is what smooth builds are made of.