• We disassembled an old riding arena east of Barrhead Alberta and rebuilt it to meet code standards.
    • This build had a strong significance in the township. It was initially built in 2005 as the community’s hockey arena.
    • After finishing the exterior, we installed all the interior wall liner, electrical, and insulated the riding arena with cellulose insulation.
    • The hallway was constructed into a viewing room with 4 large windows, a kids play area, electrical room and change rooms for patrons and riders.