Seven Mistakes People Make on Their First Shop Build

After 20-plus years of building across Alberta and Saskatchewan, we’ve heard every version of “I wish we’d done that differently.” The list is surprisingly short and surprisingly consistent. Here it is, so your first build can skip it.

1. Building too small

The most common regret, by a wide margin. Equipment gets bigger, the collection grows, and the shop that fit everything on day one is jammed by year five. We wrote a full guide on sizing a shop properly, but the short version is: measure what you own, plan for what you’ll own in ten years, and add length.

2. Treating insulation as an afterthought

“We’ll insulate it later” is how cold shops get built. Later rarely comes, and when it does, it costs more and works worse, because the wall wasn’t designed for it. Insulation is a design decision, not an accessory. Wall depth, vapour barrier, ceiling, and doors all have to work together, and that only happens when it’s planned from the start. More on that in Why Most Prairie Shops Are Cold.

3. Undersizing the doors

Width problems are obvious on day one. Height problems show up the day you raise the loader or buy the taller trailer. Pick door sizes for the biggest thing you’ll ever pull through, add clearance, and remember the ceiling needs to be tall enough for the door to actually open.

4. Skimping on site prep

Water is patient. A pad without proper grading and drainage sends it against your posts and slab for the next thirty years. And an approach that’s too tight for a truck and trailer turns every arrival into a ten-point turn. The dirt work isn’t the exciting part of the project, but it decides how the building ages.

5. Picking the frame type before defining the use

Plenty of people call asking for a post frame building when what they’re describing is a stick frame job, and the other way around. The building’s use should choose the frame, not habit or whatever the last guy built. We compared all three honestly in Post Frame vs Stick Frame vs Engineered.

6. Leaving power, lighting, and heat for later

Where the panel goes, where the welder plug goes, where the lights and heater hang. These decisions are cheap on paper and expensive after the liner is on. A shop wired and lit for how you actually work is a different building than one with a light in the middle and an outlet by the door.

7. Choosing a builder on the quote number alone

Two quotes are rarely quoting the same building. What’s included, what’s excluded, who does the insulation, what the cladding gauge is, who stands behind the work in year five. The cheapest number often gets expensive through extras. Ask what’s in the quote, and ask who actually does each part of the work.


None of these are expensive to avoid at the planning stage. All of them are expensive to fix after. If you’re at the planning stage now, that’s the right time to talk.